Mike88se
Well-Known Member
- Joined
- Oct 11, 2013
- Threads
- 76
- Messages
- 738
Had a lot of rotten spots in the old floor and been meaning to install new wood. Finally got around to it. I used treated lumber and also spread some Thompsons water seal on it. I added some grit to the sealer for the top of the boards. The way I got the old boards out and the new ones in was to cut slits in the metal and then bent the pieces back to create a slot slightly bigger than the boards. Once I had the new boards in I bent and hammered the metal back in place. Worked out great.
Also wirebrushed the frame and spread on some rust converter and primed it.
Took most of a day but it should last a lifetime. Mine anyway
Also wirebrushed the frame and spread on some rust converter and primed it.
Took most of a day but it should last a lifetime. Mine anyway